The project included the demolition of existing data rooms and the installation of new AV racks, HVAC systems, UPS infrastructure, battery backup systems, bypass cabinets, in-row cooling units, and switchgear within the upgraded technology level. Work also included the installation of a FireFlex fire protection system, advanced access control systems, and over 4,000 linear feet of IT, low-voltage, and high-power distribution pathways throughout the terminal. The final phase included rooftop condensing units, critical mechanical system upgrades, and commissioning of the new data center environment, resulting in a modernized, resilient, and secure technology infrastructure capable of supporting future growth.