This ongoing project includes construction of a new reinforced concrete seawall and flood protection barrier system to improve shoreline stabilization, reduce flooding risks, and enhance long-term resilience. Work includes installation of protective railings and safety features, along with all required excavation, formwork, concrete placement, reinforcement, and structural tie-ins. The scope also includes restoration of the existing pedestrian pathway through concrete repairs, resurfacing, leveling, and replacement of deteriorated sections to improve accessibility and public safety.